High Production Units
         With Insert assemblies
                                      Double-End

                        Tube is notched at both ends at a rate of 3000 an hour.

High production tube fabrication. Tubes are notched at both ends at a rate of 3000 an hour.

When a tube count is reached the tubes are auto-released into a side rack for bailing & shipping.




  • H125DN-D   Automated function with manual load option. 6” tube length to 144”

  • H237DN-D   Automated function with manual load option. 6” tube length to 360”

  • H237DN2-D  High speed double tube double notch notching systems.
  • Email us 

     

Double notch housing. D237DN- Notching assemblies.  Double notch housing.

D237DN- Notching assemblies.
                                                         

  • Double notch unit takes up to a 2" sch 40 pipe. With a single stroke  two notches are  notched in one end of tube.

 

H237DN Inserts (left) H125DN Inserts (right) quick-change tooling
Air-Blast slug ejection for high speed performance.


AddThis Social Bookmark Button

The INNOVO Corporation Builders of quality automation equipment for the tubular fabrication industry. We hope you find what you are looking for.


Contact us